Low-Voltage (ELV) Systems: Cabling, Security and Building Systems

Discovery, design support, installation and maintenance for the data, voice, video and control infrastructure of a building, planned as one.

In short

Low-voltage (ELV) systems are the data, voice, video and control systems that run at far lower voltages than mains power: cabling, networks, telephony, CCTV, access control, public address and building automation. Sora Yazılım provides discovery, installation and maintenance services that plan these systems together in İzmir and its surroundings.

Which systems count as low-voltage (ELV) systems?

We group low-voltage systems into three families. Each card leads to a detailed page explaining what the system does and what our service scope covers.

What is the difference between low-voltage and power systems?

Power installations deliver energy to a building; low-voltage (ELV) systems carry information and signals. The two run side by side in the same building, but they are designed and installed as separate disciplines.

Low-voltage (ELV) and power installations compared
AspectLow-voltage (ELV)Power
PurposeCarrying data, voice, video and control signalsSupplying energy to lighting, sockets and machinery
Typical systemsCabling, networks, telephony, CCTV, access control, PA, fire detectionDistribution boards, lighting, socket circuits, generators
Cable typesData cable, fibre, coaxial, signal cablePower cables
RoutingIn dedicated trays and trunking, separated from power runsIn power trays and trunking
DesignELV design, coordinated with the electrical designElectrical (power) design

Separation distances between the two installations and earthing are set by the relevant standards and the project design. A fire detection system also runs at low voltage, but because it is a life-safety system we cover it separately under fire protection systems.

Low-voltage systems diagram: network and communication, security, and building systems on shared cabling infrastructure
Most low-voltage systems share the same cabling and network infrastructure, so planning them together reduces cost and complexity.

How does a low-voltage (ELV) project run?

An ELV project starts with a discovery that looks at all the systems together rather than one by one. Once the shared cabling and cabinet plan is in place, the systems are installed and tested in sequence.

  1. Discovery call: we discuss the building, its users and the systems you need.
  2. Site survey: cabinet locations, cable routes and the existing installation are inspected.
  3. Shared infrastructure plan: cabling, cabinets, power and network needs are worked out for all systems at once.
  4. Proposal and schedule: the order in which the systems will be installed is set out in writing.
  5. Installation: passive infrastructure goes in first, followed by active devices and systems.
  6. Testing and integration: each system is tested on its own, then the scenarios between them are tried.
  7. Handover and maintenance: documentation and user training are delivered and maintenance is planned.

Which low-voltage systems matter most in which type of building?

Not every building needs every system; the need depends on how the building is used. The table below sums up the combinations we discuss most often in discovery calls; the definitive list comes out of the survey.

Low-voltage systems commonly needed by building type
Building typeSystems that commonly come up
Offices and office towersStructured cabling, network and Wi-Fi, IP telephony, access control, meeting room AV
Factories and warehousesCabling and fibre backbone, CCTV, access control and time attendance, licence plate recognition, PA
Hotels and accommodationNetwork and Wi-Fi, IP telephony, central TV distribution, background music and PA, CCTV
Hospitals and clinicsNurse call, IP telephony, network, CCTV, PA
Schools and educationCabling, Wi-Fi, public address, CCTV, meeting and classroom AV
Residential complexesVideo door entry, CCTV, licence plate recognition and car park management, central satellite TV

How do low-voltage and fire protection systems work together?

A safe evacuation during a fire depends on the low-voltage systems being correctly linked to the fire alarm panel, so both should be considered together from the start of the project.

We cover detection, suppression and passive protection on our fire protection systems page; for example, fire detection and alarm systems deals with the panel at the heart of these scenarios.

  • When the fire alarm is raised, card-controlled doors on escape routes are released.
  • Lifts are sent to a designated floor, and ventilation and smoke control are managed according to the design.
  • Background music and paging give way to the voice evacuation message triggered by the fire panel.
  • Cameras covering the alarm zone can be brought up on a monitoring screen, and the building management system logs the event.

What should you prepare before starting a low-voltage project?

A few pieces of information make the discovery call far more productive. You do not need all of them, but sharing what you have speeds up planning.

  • Architectural plans or floor sketches (and electrical and ELV drawings, if available).
  • Building-specific usage figures such as the number of users, desks, rooms or beds.
  • A list of the systems you need and their priority.
  • The state of the existing installation: what will be reused, replaced or removed.
  • Spaces that can be set aside for cabinets and a comms room.
  • Working conditions: whether the building is occupied and which hours are available.

What are the common mistakes in low-voltage projects?

The most expensive mistakes come from planning the systems at different times, each without knowledge of the others.

  • Running separate cables for every system: without a shared cabling plan, ceilings are opened again and again.
  • Forgetting cabinets, power and cooling: once devices are installed, cabinet space and power become a problem.
  • Accepting handover without documentation: without a cable schedule and drawings, every fault starts with a new survey.
  • Leaving fire scenarios until last: door and lift interfaces are hard to add later if they are not planned from the outset.

Frequently asked questions

Do all low-voltage systems have to come from a single company?
No, but because the systems share the same cabling, cabinets and network, working to one plan with one point of contact makes coordination easier. Even with several contractors, drawing up the shared infrastructure plan first avoids opening ceilings repeatedly and mismatched installations. Putting in writing at proposal stage who is responsible for what also closes gaps in responsibility.
When should ELV systems be planned in a new building?
Ideally alongside the architectural and electrical design, before walls and ceilings are closed. At that stage, conduits, trays, risers and cabinet locations can be reserved easily. Planning at the end of construction can mean surface-mounted trunking and higher installation costs. Leaving spare conduit and tray capacity for systems added later also makes future work much easier.
Can the low-voltage infrastructure of an existing building be renewed?
Yes. In occupied buildings the work is split into sections and can be carried out outside working hours. First we assess which parts of the existing installation can be reused; then the new infrastructure is installed and tested and users are moved across in a controlled way. If old and new systems need to run in parallel for a while, that transition is planned from the start.
Which documents should be handed over at the end of an ELV project?
It depends on the systems installed, but the handover should include cable schedules, cabinet layouts, equipment lists, configuration details, test results and as-built drawings. These documents are the basis for maintenance, fault-finding and expansion, and the list should be written into the proposal. Keeping a digital copy with building management also helps any team that works on the site later.
Which areas do you cover for low-voltage systems?
We provide on-site installation and maintenance in İzmir and its surroundings: İzmir districts such as Menemen and Selçuk, plus Manisa and Aydın. For a building outside this area, we first discuss your request in a discovery call and confirm together whether the scope is a fit. Because the first conversation can take place by phone or online, that step does not depend on location.
How is a discovery call arranged?
Simply write the building type, location and the systems you need in the request form on this page; we will call you for a short initial conversation. If needed, a site survey is then arranged. The discovery call is free and involves no commitment. If you can share plans, sketches or photos, the first conversation will be more productive.
Request form

Low-voltage (ELV) systems request

Including the building type, location and the systems you need speeds up the first conversation.

Free discovery call
No commitment; the quote is prepared after the survey.
Service area
İzmir and its surroundings (districts such as Menemen and Selçuk, plus Manisa and Aydın)
Your personal data
Form details are processed to answer your request; see the privacy notice for details. Privacy notice
24 saat içinde geri dönüş yaparız.

Let us talk about your low-voltage project

New build, refurbishment or upgrade: tell us about your building and the systems you need, and we will start the discovery process together.

WhatsApp Support